Project :

TURNAROUND / Opening, Cleaning, Blasting and Painting Two (2) Tanks T-832, T-843, Desalter Vessel, V-106 and Different Painting Works at TOBRUK REFINERY

Contract:

SOT 10450-001

Duration:

1 Month

Scope of Work:

  • :: Internally cleaning, grit blasting as required and repainting of two (2) production tanks and Desalter vessel, V-106
  • :: Painting works includes also many different painting works for TOBRUK REFINERY as the steel structure, vessels, pumps, pipe and other equipment

Project :

SHUTDOWN / Floor Replacement and Painting of Desalinated Water Tank TK76D-01 at Methanol Plant (1)

Contract:

908209/2010

Duration:

1 Month

Scope of Work:

  • :: Removal of existing tank floor plates.
  • :: Laying down new bottom plates considering of annular ring and floor plates, and welding them together and to the bottom/shell course.
  • :: Blasting and coating all areas on the first, Second & Third course of tank interio.r
  • :: Grit blasting and painting of tank exterior (Total Surface), including tank handrail, Absorption Vessel, handrails and stairways.
  • :: Repairs of damages as required caused to tank exterior painting by welding torching activities during the tank bottom plate’s replacement.
  • :: Repair or replace stairway, handrail and safety ladders as required.
  • :: Repairs of concrete tank base.
  • :: Repair or replace of soil (Caliche) & top asphalt layer under bottom floor plates.